ITE Technical Group Submission System
Conference Schedule
Online Proceedings
[Sign in]
    [Japanese] / [English] 
( Committee/Place/Topics  ) --Press->
 
( Paper Keywords:  /  Column:Title Auth. Affi. Abst. Keyword ) --Press->

All Technical Committee Conferences  (Searched in: All Years)

Search Results: Conference Papers
 Conference Papers (Available on Advance Programs)  (Sort by: Date Descending)
 Results 1 - 8 of 8  /   
Committee Date Time Place Paper Title / Authors Abstract Paper #
IIEEJ, AIT 2018-08-10
14:45
Nagano Shinshu Univ. Program Production Support System Using Image Recognition Technology -- Utilization of Real-time Indexing --
Takayuki Shinoda, Makoto Sato, Masato Kamizaki, Toshiaki Suzuki (NTV), Kazushige Ouchi, Tomoyuki Sshibata, Yuto Yamaji, Daisuke Kobayashi (Toshiba)
Extracting metadata from contents is becoming more important in production support and Internet distribution. The task o... [more] AIT2018-171
pp.73-76
BCT, IEEE-BT 2017-07-27
13:10
Hokkaido Sapporo center for gender quality Transmission technologies for new-frequency FPUs
Takayuki Nakagawa (NHK)
A government policy required FPUs (field pick-up units) operating in the 700-MHz band to change to 1.2-GHz and 2.3-GHz b... [more] BCT2017-62
pp.5-8
BCT, IEEE-BT, HOKKAIDO [detail] 2016-07-28
14:35
Hokkaido Hokkaido Univ. Development of Antenna sharing Diversity System
Masayuki Hirabayashi, Tomomi Fukazawa (TBS television), Tatsuhiro Nakata, Mikio Fujikura (Hitachi Kokusai Denki)
A 700MHz-band OFDM-FPU, that is a kind of wires link, has been used for road-race broadcasting. At present, migration to... [more] BCT2016-56
pp.13-16
BCT, IEEE-BT 2015-06-05
15:30
Tokyo mmbi, Inc. [Special Talk] Broadcasting mobile relay system in new frequency band
Satoshi Morimoto (FUJITV)
To cope with the license expiration granted for 700MHz FPU operations at the end of March 2019, spectrum reallocation of... [more] BCT2015-48
pp.17-22
BCT, KYUSHU, IEEE-BT, IEEE-AP-S-FUKUOKA 2014-01-29
17:10
Nagasaki Nagasaki Univ. [Special Talk] The production engineering plans for road races
Haruyasu Onoda (tv asahi corporation)
In 2003, terrestrial digital HDTV broadcasting service started. Most of the TV programs were produced in HDTV. However, ... [more] BCT2014-20
pp.77-79
BCT, IEEE-BT, SHIKOKU 2013-09-13
14:55
Kagawa   Transmission Experiment on the "Hiroshima Ekiden" Course toward Frequency Migration of FPU
Toshifumi Miyata, Susumu Kanzaki, Kosuke Hara, Fumihiro Murakami, Josei Yamanaka, Takahiko Niwa, Takayuki Nakagawa, Fumiki Uzawa (NHK)
FPU (Field Pick-up Unit) system using OFDM (Orthogonal Frequency Division Multiplexing) in 700MHz band is used for outsi... [more] BCT2013-92
pp.17-20
BCT, HOKKAIDO, IEEE-BT 2012-07-19
13:55
Hokkaido Hakodate-Simin-Kaikan Field Test of 2x2 STTC-MIMO-OFDM System
Takayuki Nakagawa, Uzawa Fumiki, Kazuhiko Mitsuyama, Tetsuomi Ikeda (NHK)
Feasibility study on a frequency reallocation of Field Pick-up Unit (FPU) system from 700-MHz band to 1.2-GHz or 2.3-GHz... [more] BCT2012-62
pp.9-12
BCT, IEEE-BT 2010-06-17
14:10
Tokyo Kikai-Shinko-Kaikan Bldg. Development of 2x2 STTC-MIMO Transmission Equipment for Advanced FPU
Takayuki Nakagawa, Fumiki Uzawa, Kazuhiko Mitsuyama, Tetsuomi Ikeda (NHK)
The authors have been studying space-time trellis coded multiple-input multiple-output (STTC-MIMO) transmission technolo... [more] BCT2010-50
pp.5-8
 Results 1 - 8 of 8  /   
Choose a download format for default settings. [NEW !!]
Text format pLaTeX format CSV format BibTeX format


[Return to Top Page]

[Return to ITE Web Page]


The Institute of Image Information and Television Engineers (ITE), Japan